Idaho Transportation Department |
![]() |
|
||||||
|
|
|||||||
• North Idaho• North-Central Idaho • Southwest Idaho • South-Central Idaho • Southeast Idaho • East Idaho ProjectsIdaho Transportation BoardStatewide Transportation Improvement ProgramMetropolitan Planning OrganizationsLocal Highway Technical Assistance CouncilNatl. Environmental Policy Act (NEPA) ![]() |
ITD I-84, Cloverdale Road Overpass
Project Facts
Key Number: 10949Project Number: A010(949) Project Background
The Cloverdale Overpass was damaged in July 2006 when it was struck by an over-height vehicle traveling eastbound (EB) on Interstate 84 (I-84). The impact damaged several bridge girders requiring weight restrictions on the structure. After careful analysis, the Idaho Transportation Department determined two girders on the overpass needed to be replaced.
Current traffic on Cloverdale Road exceeds 7,900 vehicles per day. Project Description
This project included removing and replacing two damaged bridge girders, and portions of the existing bridge railing and bridge deck on the Cloverdale Overpass.
Schedule of Work
Beginning May 30 at 9 a.m., the Interstate 84 Cloverdale Road Overpass closed to all vehicles, pedestrians and bicycles. The bridge reopened on Friday, June 29. During construction, Cloverdale between Overland Road and I-84, and between Franklin Road and I-84, was open to local traffic only. Traffic was detoured to Eagle Road via Franklin and Overland roads. Eastbound I-84 was closed to nighttime traffic between the Eagle Road Interchange and I-184 (the Connector) on June 1 and 2 from midnight to 5 a.m. Signage directed traffic around the project area, using Franklin Road as a detour route. Through the work zone, eastbound I-84 traffic had a reduced speed limit of 55 mph, closed shoulders and periodic nighttime lane reductions. The inside westbound shoulder also was closed, though no speed reduction or lane closures will occured on the westbound interstate. Make Comments
The Idaho Transportation Department values your input. Submit written comments using one of the
forms below or contact for more information.• Email Us please include your name and address • Download a comment form (word doc) Compliance with Title VI of the Civil Rights Act
The Idaho Transportation Department (ITD) is committed to compliance with Title VI of the Civil Rights Act of 1964 and all related regulations and directives. ITD assures that no person shall on the grounds of race, color, national origin, gender, age, or disability be excluded from participation in, be denied the benefits of, or be otherwise subjected to discrimination under any ITD service, program, or activity. The department also assures that every effort will be made to prevent discrimination through the impacts of its programs, policies, and activities on minority and low-income populations. In addition, the department will take reasonable steps to provide meaningful access to services for persons with Limited English Proficiency.Project Documents
Press Releases
comments@itd.idaho.gov P.O. Box 7129 Boise, ID 83707-1129 Phone: (208) 334-4444 Fax: (208) 334-8563 TDD: (208) 334-4458
|