Road maintenance projects consist of sealcoats, rut filling, asphalt overlays, and mill/overlay processes. Following is an explanation of each type of maintenance process:
- Sealcoat – an application of liquid asphalt to an existing asphalt roadway then coated with gravel chips.
- Micro-sealcoat – essentially same as sealcoat, but premixed and applied as slurry to an asphalt surface.
- Rut filling – also known as a scrub coat, consists of a thin layer of plantmix asphalt about an inch deep; often used to level an existing roadway prior to a seal coat or overlay.
- Thin-lift asphalt overlay – a layer of plantmix asphalt between one and two inches deep applied to an existing roadway.
- Regular-lift asphalt overlay – a layer of plantmix asphalt between two and five inches deep applied directly to an existing roadway and often followed by a sealcoat.
- Mill and inlay/overlay – Milling consists of grinding off to two inches of existing asphalt roadway to remove rutting, cracks and inconsistencies of the surface. Followed by inlay paving to bring the roadway back to level and is often followed by a full-width overlay.
The following projects are scheduled to be funded and completed in 2012:
Key # |
Project Name |
Route |
MP |
Process |
11077 |
Burley to Salt Lake City IC |
I-84 |
207.72 – 215.94 |
Sealcoat |
|
|
I-84 |
215.94 – 222.00 |
Sealcoat |
|
|
I-84 |
Jerome Rest Area |
Sealcoat |
12927 |
King Hill to West Bliss |
I-84 |
129.82 – 137.7 |
Sealcoat |
|
|
I-84B |
169.44 – 172.6 |
Sealcoat |
|
|
I-84B |
138.6 – 138.97 |
Sealcoat |
11598 |
100 E Road to Jct. I-84 |
SH-24 |
53.394 – 58.043 |
Reg. Overlay |
11600 |
FY12 District-wide Sealcoats |
SH-46 |
87.09 – 90.58 |
Sealcoat |
|
|
SH-46 |
96.882 – 100.00 |
Sealcoat |
|
Blue Lakes Blvd. |
US-93 |
48.48 – 49.455 |
Microseal |
|
|
SH-77 |
7.482 – 18.12 |
Sealcoat |
11601 |
Poison Creek |
US-20 |
171.13 – 181.1 |
Thin overlay/seal |
11602 |
Shoshone Area, East |
US-20 |
130.64 – 136.42 |
Sealcoat |
|
|
US-20 |
185.9 – 191.43 |
Sealcoat |
|
|
SH-24 |
64.9 – 66.92 |
Sealcoat |
|
|
SH-46 |
101.00-110.47 |
Sealcoat |
11603 |
Shoshone Area, West |
US-30 |
180.6 – 181.26 |
Sealcoat |
|
Kimberly Rd. |
US-30 |
219.74 – 222.18 |
Sealcoat |
|
Jerome, Main St. |
SH-25 |
0.0 – 2.10 |
Sealcoat |
|
Burley, Overland Rd. |
SH-27 |
23.153 – 23.641 |
Sealcoat |
|
|
SH-74 |
0.00 – 7.83 |
Mill-inlay/seal |
12068 |
SH75, Jct. US20 to MP105.6 |
SH-75 |
102.12 – 105.61 |
Overlay/micro |
12388 |
Jct. SH81 IC#228 to MP 239 EBL |
I-84 EB |
229.35 – 239.4 |
Mill-inlay/overlay |
Contacts
District 4 Public Information Specialist
nathan.jerke@itd.idaho.gov
208-886-7809
Resident Engineer
justin.price@itd.idaho.gov
208-886-7851
Compliance with Title VI of the Civil Rights Act
The Idaho Transportation Department (ITD) is committed to compliance with Title VI of the Civil Rights Act of 1964 and all related regulations and directives. ITD assures that no person shall on the grounds of race, color, national origin, gender, age, or disability be excluded from participation in, be denied the benefits of, or be otherwise subjected to discrimination under any ITD service, program, or activity. The department also assures that every effort will be made to prevent discrimination through the impacts of its programs, policies, and activities on minority and low-income populations. In addition, the department will take reasonable steps to provide meaningful access to services for persons with Limited English Proficiency.