ITD Projects GARVEE D3 I84_Orchard_to_Isaacs I-84, Gowen Road Interchange

I-84, Gowen Road Interchange


Project Facts

Project Number: A009(822) & A013(812)
Key Number: 09822 & 13812
MP 55.12-57.35

The Idaho Transportation Department will replace the I-84, Gowen Road interchange in Boise. A third level will be added in each direction on I-84 between the Broadway Avenue and Gowen Road interchanges. The project will reduce congestion, enhance safety and improve traffic flow.

The new design for the interchange will include:

  • Dual left-turn lanes for the westbound I-84 on-ramp.
  • Three through eastbound lanes and two through westbound lanes on Gowen Road.
  • Adding a signal at the westbound off-ramp.
  • Curb, gutter, sidewalks and bicycle lanes on I-84.
  • Longer, wider I-84 on- and off-ramps.

For more information about the project click here for a project fact sheet.

In addition to the Gowen Road Interchange reconstruction, ITD will be replacing the Broadway Avenue Interchange in Boise and the Meridian Road Interchange in Meridian. For more information, click here.



Background

This project is a result of an Environmental Assessment and a planning study for I-84 from just west of the Orchard Interchange to the Isaacs Canyon Interchange (Eisenman Road). The interstate, built in the late 1960s, was not designed to handle the current traffic volumes. The study recommended improvements for this corridor, including replacing the existing pavement, adding lanes to the interstate, installation of soundwalls, and reconstructing the Orchard, Vista, Broadway, and Gowen interchanges to meet future traffic capacity requirements.

ITD received environmental approval for this project from the Federal Highway Administration in November 2007. For more information about the Environmental Assessment, click here.


Schedule
  • Complete preliminary design: Spring 2013
  • Work with property owners and businesses: Spring 2013
  • Present design plans to the public: Summer 2013
  • Purchase right-of-way: Summer 2013
  • Finalize design plans:
  • Begin construction: Winter/Spring 2014

Compliance with Title VI of the Civil Rights Act

The Idaho Transportation Department (ITD) is committed to compliance with Title VI of the Civil Rights Act of 1964 and all related regulations and directives. ITD assures that no person shall on the grounds of race, color, national origin, gender, age, or disability be excluded from participation in, be denied the benefits of, or be otherwise subjected to discrimination under any ITD service, program, or activity. The department also assures that every effort will be made to prevent discrimination through the impacts of its programs, policies, and activities on minority and low-income populations. In addition, the department will take reasonable steps to provide meaningful access to services for persons with Limited English Proficiency.





Contact Us
comments@itd.idaho.gov
P.O. Box 7129 • Boise, ID 83707-1129
Ph: (208) 334-8119 • Fax: (208) 334-8563
TDD: (208) 334-4458


Project Materials
News Release and Brochure

 
ITD Public Involvement
comments@itd.idaho.gov
P.O. Box 7129
Boise, ID 83707-1129
Phone: (208) 334-8119
Fax: (208) 334-8563
TDD: (208) 334-4458

Page Last Modified: 4/30/2013 1:43:21 PM

About Us | Traveler Services | DMV | Projects | News And Info| Privacy & Security
Idaho Transportation Department
3311 W. State Street · P.O. Box 7129
Boise, ID 83707-1129
(208) 334-8000