Idaho Transportation Department

Stormwater

A consent decree between the Idaho Transportation Department (ITD) and the Environmental Protection Agency (EPA) was signed in 2006. Following are the requirements for ITD.

ITD shall train staff in Stormwater Management covering the following topics:

On projects where a NPDES permit is required, ITD shall require all contractors to designate a Water Pollution Control Manager (WPCM) who shall visit the project on a frequent basis and in no instance less than once per week during the construction period. The WPCM shall attend a 16 hour storm water management training course in the 12 months prior to beginning of construction. The topics will be similar to those listed above.

Inspection Procedures shall include the following:

The Contractor and ITD shall:

Stormwater Information