|
ITD-RP097-INT(2) |
Review and Modification of Resilient Modulus Test Procedures and Apparatus, 6/30/81
[Click here for more information.]
|
|
FHWA-ITD-RP099 |
Effects of I-90 Construction Activities on Spawning Success of Kokanee (Oncorhynchus Nerka) in Coeur d'Alene Lake, 10/1/82
[Click here for more information.]
|
|
ITD-RP101-INT |
Evaluation of Idaho's First Sulphur Extended Asphalt (SEA) Pavement, Demonstration Project No. 54, 6/1/82
[Click here for more information.]
|
|
ITD-RP102 |
Selection and Evaluation of Methods and Treatments for Acceptable Fatigue Life of Moisture-Susceptible Dense-Graded Asphalt Concrete: Southern Idaho Aggregates, 3/31/83
[Click here for more information.]
|
|
ITD-RP105 |
Full Scale Experimental Investigation of the Structural Response of the Bonners Ferry Bridge, 1/1/87
[Click here for more information.]
|
|
ITD-RP109B |
Estimating Capacity and Delay at a Single-Lane Approach All-Way Stop-Controlled Intersection, 1/1/89
[Click here for more information.]
|
|
ITD-RP109C |
Determination of a Model to Predict Winter Maintenance Personnel Levels, 9/20/89
[Click here for more information.]
|
|
ITD-RP110A |
A Procedure to Calculate the Economic Benefit of Increased Pavement Life that Results from Port-of-Entry Operation, 12/21/90
[Click here for more information.]
|
|
ITD-RP110B |
Capacity and Delay Characteristics of Two-Way Stop-Controlled Intersections, 10/1/90
[Click here for more information.]
|
|
ITD-RP110C |
Benefit Cost Analysis of Winter Maintenance Levels of the Idaho Transportation Department, 3/3/91
[Click here for more information.]
|