• North Idaho• North-Central Idaho • Southwest Idaho • South-Central Idaho • Southeast Idaho • East Idaho ProjectsIdaho Transportation BoardStatewide Transportation Improvement ProgramMetropolitan Planning OrganizationsLocal Highway Technical Assistance CouncilNatl. Environmental Policy Act (NEPA) ![]() |
ITD US-91 North Corridor Plan
Project Facts
Key Number: 08116Project Number: STP-1767(101) The Idaho Transportation Department (ITD) has developed a 20-year corridor plan for US-91 to provide a comprehensive, long-range planning document that will guide corridor management and project programming over the next 20 years. The US-91 Corridor Plan addresses transportation needs and proposed improvements for 40 miles of US-91 from Siphon Road in the City of Chubbuck to Sunnyside Road in the City of Idaho Falls. A Public Review Draft US-91 Corridor Plan is now available for review and comment. Project Background
The corridor plan examines the role of US-91 in the transportation system, identifies existing roadway problems and needs, documents existing environmental and land use conditions that may be impacted or benefit from future highway improvements, what the future transportation conditions and needs will be in 20 years, and develops goals and objectives for future improvements to, and management of the highway.
The Public Review Draft Corridor Plan recommends a number of corridor-long safety improvement management strategies as well as several specific improvement projects. The plan was developed in consultation with the Shoshone-Bannock Tribes, business and community stakeholders, city and county elected officials and technical staff, resource agency representatives, adjacent landowners, and other interested parties in the corridor study area. Make Comments
The Idaho Transportation Department values your input. The US-91 North Corridor Plan Public Review Draft is available for review and comment. Click on this link to see locations and addresses where reference copies of the Draft Corridor Plan will be available as of January 4th, 2008.
Individual copies of the plan are also available in pdf format on a CD ROM. Upon request, a copy will be mailed by regular mail. To request a copy, please contact Diana Atkins or Chris Peirsol. Their contact information is available below. Comments are requested by February 15, 2008. Contacts
Chris Peirsol, ITD Project Manager Idaho Transportation Department District 5 P.O. Box 4700 Pocatello, ID, 83201 Telephone (208) 239-3369, FAX (208) 239-3367 chris.peirsol@itd.idaho.gov Diana Atkins, PB Project Manager Parsons Brinckerhoff 488 East Winchester, Suite 400 Murray, Utah 84107 Telephone (801) 288-3227, FAX (801) 262-4303 atkins@pbworld.com Compliance with Title VI of the Civil Rights Act
The Idaho Transportation Department (ITD) is committed to compliance with Title VI of the Civil Rights Act of 1964 and all related regulations and directives. ITD assures that no person shall on the grounds of race, color, national origin, gender, age, or disability be excluded from participation in, be denied the benefits of, or be otherwise subjected to discrimination under any ITD service, program, or activity. The department also assures that every effort will be made to prevent discrimination through the impacts of its programs, policies, and activities on minority and low-income populations. In addition, the department will take reasonable steps to provide meaningful access to services for persons with Limited English Proficiency.