Showing 34 projects for Southwest Idaho
-
I-84 Karcher Interchange
A redesigned interchange will increase safety and mobility in Nampa.
-
Project Regions
Southwest Idaho -
Project Routes
Interstate 84 State Highway 55 -
Project Phase
In Construction
-
-
US-20/US-26 Chinden Drainage and Design Study
In partnership with Garden City, ITD is conducting a drainage and design study along Chinden Boulevard (U.S. Highway 20/26).
-
Project Regions
Southwest Idaho -
Project Routes
US-20 US-26 -
Project Phase
Planning & Design
-
-
SH-52 Snake River Bridge Replacement
The bridge has reached the end of its service life and will be replaced.
-
Project Regions
Southwest Idaho -
Project Routes
State Highway 52 -
Project Phase
Planning & Design
-
-
SH-55 Rainbow Bridge
ITD is designing a new bridge over the North Fork of the Payette River and determining the future of the existing Rainbow Bridge.
-
Project Regions
Southwest Idaho -
Project Routes
State Highway 55 -
Project Phase
Planning & Design
-
-
I-84 Mobility Improvement Study
The Idaho Transportation Department is studying current and projected future traffic volumes on Interstate 84 between the Garrity Boulevard Interchange and the Flying Wye Interchange.
-
Project Regions
Southwest Idaho -
Project Routes
Interstate 84 -
Project Phase
Study
-
-
SH-16 from SH-44 to SH-52
ITD is conducting an environmental reevaluation to gather updated traffic numbers and study potential impacts that improvements would have to the area.
-
Project Regions
Southwest Idaho -
Project Routes
State Highway 16 State Highway 44 State Highway 52 -
Project Phase
Planning & Design
-
-
US-20/US-26 Chinden West
In response to increasing traffic and projected growth, ITD has developed a comprehensive plan that will improve safety, reduce congestion, and increase capacity.
-
Project Regions
Southwest Idaho -
Project Routes
US-20 US-26 -
Project Phase
Planning & Design
-
-
I-84 Meridian Interchange to Eagle Interchange
An auxiliary lane on I-84 between the Meridian Road Interchange (Exit 44) and the Eagle Road Interchange (Exit 46) will smooth the flow of traffic.
-
Project Regions
Southwest Idaho -
Project Routes
Interstate 84 -
Project Phase
Planning & Design
-
-
SH-55 Farmway to Middleton
This project will improve safety and capacity along SH-55 as well as address the current and future traffic needs along the corridor.
-
Project Regions
Southwest Idaho -
Project Routes
State Highway 55 -
Project Phase
In Construction
-
-
COMPLETE: SH-55 Rainbow Bridge Maintenance
Completed repairs will keep the bridge operating safely until it is replaced.
-
Project Regions
Southwest Idaho -
Project Routes
State Highway 55 -
Project Phase
Complete
-
-
SH-69 Corridor Traffic Study
ITD is studying State Highway 69 from Orchard Avenue in Kuna to Overland Road in Meridian.
-
Project Regions
Southwest Idaho -
Project Routes
State Highway 69 -
Project Phase
Study
-
-
SH-78 Brown’s Creek
While still in acceptable condition, the Brown's Creek Bridge's narrow width has aged out of optimal usability for wide-load trucks and farm equipment, thereby creating a public safety concern.
-
Project Regions
Southwest Idaho -
Project Routes
State Highway 78 -
Project Phase
Planning & Design
-