Traffic to shift on the US-12 Clearwater Memorial Bridge

Picture of the new surface on the Clearwater Memorial Bridge.

Traffic on the U.S. Highway 12 Clearwater Memorial Bridge will switch from the west side to the newly constructed east side of the bridge by the end of this week. Drivers can expect at least two lanes of traffic, one in either direction.

Drivers will travel on the renovated concrete surface while crews shift their attention to the west side. The next stage of construction will mirror what was performed on the east side of the bridge.

With new facilities available on the east side for pedestrians and bicyclists, the shuttle will stop operating after the shift.

The bridge improvements enhance safety and mobility by offering wider travel lanes, shoulders, median and sidewalks. In addition, the new bridge will eliminate current weight restrictions for heavy loads and bring it up to current standards.

Bridge construction will conclude by the end this year. Live traffic impacts across the region can be found by visiting 511.idaho.gov, dialing 5-1-1 or downloading the app.