An Environmental Impact Statement is now being completed that will allow ITD and cooperating agencies to greatly improve safety and mobility for I-15 traffic accessing US-20 in the Idaho Falls area.

I-15 US-20 Connector

An Environmental Impact Statement is now being completed that will allow ITD and cooperating agencies to greatly improve safety and mobility for I-15 traffic accessing US-20 in the Idaho Falls area.


Overview

The large majority of traffic on Interstate 15 through Idaho Falls exits at U.S. Highway 20. This is the primary route that connects East Idaho and takes visitors to the western entrance of Yellowstone National Park. Since 2018, we’ve been working with the city of Idaho Falls, Bonneville County and other cooperating agencies to develop alternatives that will accommodate future growth projections and increase safety and mobility.

Many public meetings have been held since then, with 29 different alternatives originally being developed based on feedback. An Environmental Impact Statement is now being completed that has narrowed those options down to two viable alternatives. The completion of the EIS process will determine which will ultimately be built to serve eastern Idaho for many, many years to come. Construction of this project is currently unfunded, with budget yet to be determined as that phase gets closer.

Interstate 15 and US-20 in Idaho Falls

I-15 Exit 119 in Idaho Falls onto US-20 aerial view.

More than 80% of Interstate 15 northbound traffic takes Idaho Falls Exit 119 onto U.S. Highway 20. This route provides important connections to the City of Idaho Falls, Bonneville County, and the East Idaho region. US-20 is also the primary route to the western access of Yellowstone National Park.

The Idaho Transportation Department (ITD), in coordination with the Federal Highway Administration (FHWA), is conducting an Environmental Impact Statement (EIS) to evaluate potential improvements to provide safe and reliable travel between and along I-15 and US-20, a project commonly known as the I-15/US-20 Connector. The study area is in Idaho Falls and Bonneville County, Idaho.

Purpose and Need

The purpose of the I-15/US-20 Connector project is to address safety, congestion, mobility, and travel time reliability for efficient movement of people, goods, and services on I-15 and US-20 in or near Bonneville County and Idaho Falls.

The needs for the project are related to multimodal and capacity improvements to I-15 and US-20 to address safety concerns on I-15 and US-20; reduce congestion at the I-15/US-20 interchanges; provide pedestrian and bicycle mobility within and across the I-15 and US-20 corridors; and address future travel demand.

Improvements are necessary to address the following needs: unsafe travel conditions caused by substandard weave/merge distances, unacceptable level of service at signalized ramp terminals, and poor pedestrian and bicycle mobility along and across the corridors.

Project Study Area

The project area of potential impact encompasses the alignments of both build alternatives and will serve as the basis for alternatives evaluation in the EIS. Specific areas of potential impact may be established for individual resources.

Detailed aerial map view of the I-15 US-20 project area with green highlighted spaces relative to the project.

Community Input

Since 2018, public meetings, community working group meetings and many informal pop-up style meetings have been held to get input from the eastern Idaho community.

This project originally included 29 different alternatives, which have now been narrowed down to two thanks to public input and further study.

 As the draft EIS is completed and released, a public hearing will be held. It’s anticipated this will be in 2026.

ITD and all cooperating agencies are appreciative of the high level of community interest and involvement in helping to make this large-scale project a positive change for eastern Idaho and all visiting travelers.

A group listens to a presentation being given as part of a public meeting concerning the I-15/ US-20 project in Idaho Falls.
A crowd visits and looks over maps and handouts in a large room at an I-15/ US-20 Connector public meeting.

Submit a comment

If you have a comment or question, please complete the general comment form by clicking on the button below.

Timeline

Click on the timeline to enlarge

  • 2018

    ITD started the Planning and Environmental Linkages study—the first of its kind for Idaho! ITD hosted public meetings in May and September and met with residents of the 81st North neighborhood in November.

  • 2019

    ITD held a second public meeting in May, conducted technical and environmental work, screened alternatives based on public feedback, and conducted further environmental study. ITD met with residents of the 49th North neighborhood in June.

  • 2020-2021

    ITD held an online public meeting in August 2020, conducted further study and screening of alternatives, and completed the PEL document in December 2020.

  • 2021

    ITD started the pre-NEPA planning process and prepared to publish the notice of intent

  • 2022

    In August, ITD published the notice of intent. In October, ITD held the EIS Public Scoping Meeting to inform the community about the proposed project and gather feedback to shape the study.

  • 2023-2024

    ITD hosted interagency meetings and reviews, including a January 2023 Community Working Group meeting, and conducted enhanced environmental studies in accordance with NEPA requirements and recommendations.

  • 2025-2027

    ITD continues refining alternatives, study documents and federal reviews before publishing the Draft EIS.

  • 2027

    ITD will prepare to release the Draft EIS and host a public hearing.

  • 2028

    ITD will plan to publish the Final EIS, Record of Decision and issue all project permits and authorization decisions.