The Idaho Transportation Department thanks you for participating in the SH-50, Rock Creek Road project public meeting

SH-50, Rock Creek Road Intersection

The Idaho Transportation Department thanks you for participating in the SH-50, Rock Creek Road project public meeting


This project was previously funded for construction in 2032. As a result of recent changes in transportation fundingthis project is recommended to have it’s funding removed to prioritize other projects necessary to the operation and preservation of the transportation network.

Overview

The Idaho Transportation Department is planning upgrades to the SH-50 and Rock Creek Road intersection to reduce crashes and improve traffic flow.

This project was previously funded for construction in 2030. As a result of recent changes in transportation funding, this project is recommended to have its funding removed to prioritize other projects necessary to the operation and preservation of the transportation network.

The Idaho Transportation Department thanks you for participating in the SH-50, Rock Creek Road project public meeting.

About 100 community members attended the in-person and online meetings, with 30 of them submitting feedback or comments.

Watch the video below to:

  • Review feedback we received from the public
  • Learn what’s next for the project
  • Get answers to frequently asked questions

Courtney Wagner, ITD District 4 Public Information Officer

Project Overview

Map of project area with the intersection of SH-50 and Rock Creek Road highlighted in orange. Rock Creek Road is highlighted in blue.

In the first phase of design work, we will study the roadway and surrounding area. We will also look at several possible improvements. 

Improvements include: 

  • Reducing the number of locations where traffic can access SH-50
  • Shifting local roads to increase sight distance on SH-50
  • Building a traffic signal at SH-50 and Rock Creek Road


Process and Schedule

  • 2025

    Perform technical studies

  • 2025-2026

    Develop concepts and preliminary design plans

  • 2026-2027

    Develop final design plans

  • 2027

    Purchase right-of-way (if required)

  • 2030

    Construction anticipated to begin