Overview
This project will preserve the existing pavement on US-95 improving ride quality and helping extend the life of the roadway.
Construction planned for 2028
Project Status
This project is currently in the design phase. The project team is evaluating pavement conditions to determine the most appropriate preservation treatment, which may include options such as surface treatments, mill and inlay, or other roadway improvement strategies.
Benefits of pavement preservation include:
- Extends the life of the existing pavement
- Improves ride quality for drivers
- Addresses surface wear before more significant deterioration occurs
- Reduces the need for more costly reconstruction in the future
- Maintains a safe and reliable roadway
Timeline
-
2026-2027
Planning and Design
-
2028
Construction