Prime contractors are encouraged to post their invitation to bid/RFPs on this website when seeking Disadvantaged Business Enterprises (DBEs) for federal projects.

Invitations to Bid | Seeking DBEs

Bid Due DateProject NameContractor NameProject Details Link(s)
January 28, 2025SH-21, South Fork Payette Bridge (Lowman)Knife River Corporation - Mountain WestReplacing a bridge on SH-21, MP 72.2.
January 28, 2025SH-75, Elkhorn Rd to River St, KetchumKnife River Corporation - Mountain WestReplacing the bridge at Trail Creek and complete roadway on SH-75 from MP 126.47 to 128.21, SH-75
January 28, 2025US-95, Shoepeg Rd to Cambridge NCLKnife River Corporation - Mountain WestConstructing a mill and inlay of the travel lanes on US-95, repairing asection of the roadway slope, replacing guardrail, and replacing ADA ramps. MP 108.605 to 113.770
January 28, 2025D3 Bridge RepairsKnife River Corporation - Mountain WestBridge Repair consisting of sealing bridge decks, concrete surface &deck repair, joint replacement, HMA Overlay and structural repairs. Locations include Boise, Caldwell, GlennsFerry, Mountain Home, New Meadows, and Nampa
January 30, 2025Lenville Rd over Little Potlatch Creek Bride ReplacementS&L Underground, Inc.Bridge Replacement
January 30, 2025Lenville Rd over Little Potlatch Creek Bride ReplacementBig Sky Idaho CorpThis proposal is for the contractor to remove the existing timber bridge and replace it with a single span pre-stressed concrete voided slab bridge with reinforced concrete abutments supported by piles. The road will be closed during construction and traffic will be detoured. Additional work includes road construction due to grade raise and permitted stream alterations including placing riprap.
February 4, 2025US-95, Payette NCL to N Oof WeiserKnife River Corporation - Mountain WestSealcoating US-95 from MP 70.28 to MP 91.40; US-95, Payette NCL toN of Weiser
February 4, 2025SH-55, Horeshoe Bend SCL to BoiseE NF BoundaryKnife River Corporation - Mountain WestChip seal coating SH-55 from MP 63.27 to MP 91.60;
February 4, 2025Troy Road and Harrison Street Sewer Project- Moscow, IDBig Sky Idaho CorpThis project consists of, but is not limited to, the removal and installation of one sanitary manhole and the abandonment of sanitary sewer main, the removal of sanitary sewer main, and the installation of 10” sanitary sewer main, along with replacement of two (2) Manhole lids and rings. The installation of new sanitary sewer main includes, but is not limited to, the reconnection of existing sanitary sewer services, the installation of sanitary sewer service pipe, the, paving of all removed asphalt roadway, placement of asphalt on roadway, and the operation of a temporary bypass pump to allow connection of the new sanitary system to the existing without disruption of sewer service.
February 11, 2025SH-67, Elmore County SealcoatsKnife River Corporation - Mountain WestApplying a warranty Chipseal and Fog Coat on SH-67 MP 0 to MP 8.95& SH-167 MP 0 to 16.3
February 11, 2025Public Avenue Corridor Safety ImprovementBig Sky Idaho CorpFor the work of improving safety to create a constant roadway width, fix horizontal and vertical geometry, install curve warning signs, chevrons, and delineators.
February 12, 2025City of Choteau - Phase 2 Water System Improvement ProjectS&L Underground, Inc.Water storage tank, fencing, electrical, piping and appurtenances, traffic control, aggregate, asphalt, valves, and landscaping.