Two projects starting Monday will cause delays on SH-33 in Teton valley

State Highway 33 between mileposts 151 and 152 where a new passing lane will be constructed.

Two projects are set to begin Monday to create a center mumble strip and add a passing lane on State Highway 33. Motorists will experience lane closures and delays at various times through the summer.

A mumble strip along the center line of SH-33 will be added to increase safety and avoid collisions from the intersection of State Highway 32 to the Wyoming state line. The mumble strip will not be added within the city limits of Tetonia, Driggs and Victor. All striping will also be redone. This project will close one lane in the current work area and be complete within two weeks. Mumble strips are similar to rumble strips but are rounded so noise is heard by the driver and less by surrounding homes and businesses.

Work on the addition of a passing lane, center and right turn lanes and the realignment of Baseline Road along SH-33 between Victor and Teton Pass also begins Monday. Drivers should plan for delays between 15 and 30 minutes as temporary signals will alternate traffic through the work zone from mileposts 151 to 153. Crews will remove outdated concrete cattle underpasses and widen the road to ultimately give motorists a chance to pass slow-moving vehicles before entering Teton Pass. This work will be complete mid to late-September.

Motorists should remember to use caution and be patient through construction zones as the Idaho Transportation Department and contractors work to make the road better for the future. Stay up to date on status of these projects and others by visiting 511.idaho.gov, calling 5-1-1 or downloading the app.