The Idaho Transportation Department is studying current and projected future traffic volumes on Interstate 84 between the Garrity Boulevard Interchange and the Flying Wye Interchange.

I-84 Mobility Improvement Study

The Idaho Transportation Department is studying current and projected future traffic volumes on Interstate 84 between the Garrity Boulevard Interchange and the Flying Wye Interchange.


Overview

The Idaho Transportation Department studied current and future traffic volumes on Interstate 84 between the Garrity Boulevard Interchange and the Flying Wye Interchange to improve interstate traffic flow and develop phasing recommendations for potential future projects.

I-84 mobility study.

The I-84 Mobility Improvement Study identified targeted strategies that can improve interstate traffic flow, reduce congestion and support the region’s continued growth. To address these priorities, ITD evaluated several options:

  • Lane additions
  • Auxiliary lane additions
  • Interchange ramp improvements
  • Real-time traffic management strategies such as travel time information, ramp metering and incident detection

Why This Study is Needed

Traffic volumes on portions of I-84 have increased by an average of almost 15% from 2019 to 2025. Additionally, on- and off-ramps experience significant congestion during peak hours, causing backups on nearby roads and on I-84.

By 2055, daily traffic volumes on key segments of I-84 are projected to grow by nearly 50%, increasing congestion and travel delays if improvements are not made.

  • Garrity Boulevard Interchange to Ten Mile Road Interchange: 47% increase (132,800 to 195,100 vehicles per day)
  • Ten Mile Road Interchange to Meridian Road Interchange: 44% increase (136,800 to 196,400 vehicles per day)
  • Meridian Road Interchange to Eagle Road Interchange: 38% increase (148,600 to 204,500 vehicles per day)
  • Eagle Road Interchange to Flying Wye Interchange: 31% increase (166,200 to 217,300 vehicles per day)

Recommended Improvements

ITD recommends a combination of mainline lane and interchange ramp improvements to address traffic flow on I-84:

  • Keep four lanes of traffic on I-84 in both directions while adding auxiliary lanes between interchanges.
  • Widen interchange on- and off-ramps to two lanes.
  • Add two westbound lanes from the Flying Wye to the Eagle Interchange to improve capacity.
  • Replace the Five Mile Overpass with a new bridge to accommodate six lanes in each direction on I-84 (under design).

ITD developed these recommendations through a comprehensive evaluation of each alternative, analyzing projected traffic volumes and traffic counts, safety improvements, right of way impacts and overall cost effectiveness. This data-driven approach identified the solutions that provide operational, safety and investment benefits.

Future Benefits

By 2055, these recommendations are expected to:

  • Improve eastbound morning travel times by nearly 5 minutes when compared to not making improvements.
  • Improve westbound evening travel times by up to 10 minutes when compared to not making improvements.
  • Reduce bottlenecks and congestion to allow more vehicles to enter the interstate.

Next Steps

ITD has developed a phasing plan for constructing the recommended improvements, beginning with the Flying Wye Interchange to Eagle Interchange portions of I-84 and then moving west. ITD will proceed with design work in 2027 before construction begins.