ITD will repave a section of US-95 from Meadowlark Lane to Colburn Canyon Road to replace guardrail, repair the surface, smooth the ride for drivers, and extend the life of the roadway.

US-95 Meadowlark Lane to Colburn Canyon Road

ITD will repave a section of US-95 from Meadowlark Lane to Colburn Canyon Road to replace guardrail, repair the surface, smooth the ride for drivers, and extend the life of the roadway.


Overview

This project will preserve the existing pavement on US-95 improving ride quality and helping extend the life of the roadway.

Construction planned for 2029

Project Status

This project is currently in the design phase. The project team is evaluating pavement conditions to determine the most appropriate preservation treatment, which may include options such as surface treatments, mill and inlay, or other roadway improvement strategies.

Benefits of pavement preservation include:

  • Extends the life of the existing pavement
  • Improves ride quality for drivers
  • Addresses surface wear before more significant deterioration occurs
  • Reduces the need for more costly reconstruction in the future
  • Maintains a safe and reliable roadway

Timeline

  • 2026-2028

    Planning and Design

  • 2029

    Construction

     

Contact the project team

For questions or comments about this project, please contact the project team at kyle.schrader@itd.idaho.gov or (208) 772-1200