Online open house available now for plans to repave I-15 in Blackfoot

BLACKFOOT – The Idaho Transportation Department (ITD) is hosting an online open house starting today, Nov. 1, through Nov. 14 to share design plans and gather input for a repaving project on Interstate 15 from the South Blackfoot Interchange (Exit 89) to the U.S. Highway 26/Blackfoot Interchange (Exit 93).

Community members can join the online meeting at https://itdprojects.idaho.gov/pages/i-15-blackfoot-repaving.

While ITD is also developing plans to widen I-15 to three lanes in each direction between Pocatello and Idaho Falls, the pavement has deteriorated and needs repair. Repaving this portion of I-15 in 2025 will enhance safety and extend the life of the roadway until funding is available to widen it.

Project plans are being designed based on technical data, an environmental evaluation and input from the community. This will be the only meeting that ITD will host to discuss this project. Additional meetings will be scheduled in the future for the widening project.

Those who are interested in learning more are welcome to visit the project website at https://itdprojects.idaho.gov/pages/i-15-blackfoot-repaving, email info@pocatellotoidahofalls.org or call 208-252-5553.

ITD to host open house to solicit feedback on 2026 US-91 widening

intersection of US 91 & Siphon Road

The Idaho Transportation Department (ITD) will hold an open house on Thursday, Nov. 2 from 4 to 7 p.m. to present preliminary plans for improvements along U.S. Highway 91 (Yellowstone Highway) between Park Lawn Drive and Siphon Road.

“This is an important project for the Chubbuck area,” Project Manager Kevin Sonico said. “These improvements will address the traffic growth in the area and make it safer for both drivers and pedestrians. We encourage everyone to stop by Chubbuck City Hall any time from 4 to7 p.m. on Thursday to learn more about the project. We’ll be ready to answer questions and collect comments.”

Plans include widening US-91 from three lanes to five lanes from Park Lawn Drive to Siphon Road. The project will also install a new signal and pedestrian facilities at the Siphon Road intersection. Lighting, curb, gutter, sidewalks and a shared-use path along the east side of US-91 will be constructed. In addition, the Chester Drain will be piped.

For those who cannot attend the public meeting on November 2, ITD will post meeting displays the following day on the project website itdprojects.idaho.gov/pages/park-lawn-and-siphon for review through Nov. 16. If you have questions about the project, or would like to submit feedback, you can contact the project’s public involvement manager, Andrea Gumm, at agumm@jub.com or 208-870-8751.

Idaho Transportation Department seeks feedback on draft seven-year transportation plan

SHOSHONE — The Idaho Transportation Department (ITD) is seeking feedback on the just-released draft Idaho Transportation Investment Program (ITIP). The 2024-2030 ITIP outlines the state’s transportation priorities and guides investment decisions for the next seven years. ITD encourages everyone to review the draft and provide comments from July 1-31.

Transportation projects included in the draft ITIP range from large-scale interstate improvements to smaller projects like the installation of a new guardrail. Projects are located throughout Idaho’s 44 counties and involve all modes of transportation. Project selection is determined through technical data, as well as input from local officials and residents.

To review the complete draft plan visit itd.idaho.gov/funding to view an interactive map that allows users to learn about projects in their local area as well as submit a comment through the portal.

Local projects in the program include:

  • A project to reconstruct the roadway on SH-75 from Saddle Road in Ketchum north to North Fork Campground Road.
  • Bridge replacements on US-30, Bickell Railroad Overpass at milepost 231.9 near Murtaugh, and SH-75, Yankee Fork of Salmon Road at milepost 202.48 downriver from Stanley.
  • A reconstruction and realignment safety project on SH-75 at Torrey’s Hole RV access to Slate Creek that includes new pavement surface, riverbank stabilization, culvert installation, and installing guardrail.
  • A safety and restoration project along US-93 from Hot Springs Road to Fish Creek Road north of Carey to restore deficient pavement, repair frost damage and apply a seal coat to provide a new roadway surface.
  • Road widening with four lanes on US-93 from Jerome Butte, SH-25, north to R Canal.

Comments will be taken from July 1-31 and can be emailed to itipcomments@itd.idaho.gov or mailed to:

ITIP – Comments
Attn: Office of Communication
P.O. Box 7129
Boise, ID  83707

Paper copies of the ITIP will be provided upon request by contacting the Idaho Transportation Department (208) 334-8119.

All comments will be reviewed and incorporated into the ITIP where appropriate. Responses will be sent in September once the comment period has ended.

After approval by the Idaho Transportation Board in September, the ITIP will then be submitted to the Federal Highway Administration, the Federal Transit Administration, and the Environmental Protection Agency in October. Once finalized, ITD staff across the state will begin scoping new projects.

Public input is crucial in ensuring that the ITIP reflects the needs and desires of Idaho’s communities.

ITD to hold open house about Interstate 15 widening project between the Northgate Interchange and Fort Hall

I-15_Sign

POCATELLO – The Idaho Transportation Department (ITD) is hosting an open house on June 29 to share information and gather public input about improvements being developed for Interstate 15 (I-15) between the Northgate Interchange (Exit 73) and the Fort Hall Interchange (Exit 80).

“The interstate is in need of improvement as traffic volumes continue to increase in southeast Idaho,” said ITD District 5 Engineering Manager, Eric Staats. “ITD has determined that additional lanes are needed to enhance safety and to meet continued growth and travel demands.”

The I-15 Northgate to Fort Hall Project is part of a multi-year planning process to improve I-15 between Pocatello and Idaho Falls.

“This project between the Northgate Interchange and the Fort Hall Interchange is the first step toward widening I-15 between Pocatello and Idaho Falls,” said Staats. “We would like to get the public’s input on the designs that have been developed for the Northgate to Fort Hall segment.”

The public is invited to stop by the open house anytime between 4:00 – 6:30 p.m. on Thursday, June 29, at the Shoshone-Bannock Convention Center, Chief Targhee Room (777 Bannock Road) in Fort Hall. Project staff will be available to discuss the project and proposed design plans.

The same information will also be available online between June 29 – July 14. Participants are invited to review materials and submit comments online. For more information, please visit the project website at https://itdprojects.org/projects/i15northgatetoblackfoot/

Elements of this project are being funded with Transportation Expansion and Congestion Mitigation (TECM) funds as part of the Leading Idaho Program. The program allows ITD to accelerate project timelines to address rapid growth and build critical infrastructure today that would otherwise take many years to fund and build.

ITD is taking another look at potential alternatives for US-20; invites public to give feedback

RIGBY – The Idaho Transportation Department (ITD) invites the public to participate in in-person or online meetings in early December for the US-20 corridor between Ashton and SH-87 junction. Meetings are scheduled for the following evenings:

Monday, Dec. 5
5 p.m. – 7 p.m.
Ashton Community
Center and Library
925 Main Street Ashton, ID 83420

Tuesday, Dec. 6
5 p.m. – 7 p.m.
Island Park EMS Building
4378 County Circle
Island Park, ID 83429

For those who can’t attend in person, an online meeting will be available between Dec. 6-23 at itdprojects.org/projects/us-20-ashton-to-sh-87-jct/.

ITD is taking a second look at alternating passing lanes and other potential roadway improvements as part of the Planning and Environmental Linkages (PEL) study initiated in late 2021.

The format of the meetings will be an open house and will include computer stations featuring project mapping. Please plan to attend one of two public meetings anytime from 5 p.m. to 7 p.m. Both in-person as well as the online meeting will all share the same information, and no formal presentation will be given.

Comments on the project are always welcome but can be best utilized if received by Dec. 23, 2022.

Idaho Transportation Department now taking comments for all upcoming projects in East Idaho

EAST IDAHO – The Idaho Transportation Department (ITD) is asking for input on the just-released draft Idaho Transportation Investment Program (ITIP). The 2023-2029 ITIP is a seven-year master plan of the state’s transportation improvement projects. Everyone is encouraged to participate starting in July.

Projects can range from large-scale interstate improvements to smaller projects like the installation of a new guardrail. In all, the draft ITIP includes projects in all 44 counties and all modes of transportation. Projects were selected based on technical data, as well as input from local officials and residents.

A complete breakdown of the draft plan can be found at itd.idaho.gov/funding.

A few of the major projects in East Idaho include:

  • I-15 Northgate to Fort Hall Widening – Widen the interstate to three lanes in both North and South directions, including replacement of outdated structures, drainage facilities, and interchange merge/diverge improvements.
  • US-20 Chester to Ashton Widening – This project will build a 4-lane divided highway with the addition of 2 new interchanges.
  • Blackfoot West Bridge Street bridge replacement – Replace the aging West Bridge Street Bridge over the Snake River in Blackfoot.
  • Chubbuck, Widening Park Lawn to Siphon Road – To provide additional capacity along Yellowstone Avenue between Park Lawn and Siphon. It will also allow for the addition of a traffic signal at the intersection of Yellowstone Avenue and Siphon Road.
  • A2 Highway improvements – This project will improve the A2 Highway in Clark County by widening the roadway, fixing soft spots, adding additional base and paving the roadway.  This will include the replacement of culverts, and other minor drainage improvements.
  • SH-33 Teton County intersection improvements – This project will improve intersections and add turn lanes on SH33 from milepost 138.70 to milepost 149.40.
  • US-93 Pahsimeroi River bridge replacement – This project will replace the Pahsimeroi River bridge on US-93 in Custer County.

Comments will be taken from July 1-31 and can be e-mailed to ITDcommunication@itd.idaho.gov or mailed to:ITIP – Comments

Attn: Office of Communication
P.O. Box 7129
Boise, ID  83707

Paper copies of the ITIP will be provided upon request by contacting the Idaho Transportation Department (208) 334-8119.

All comments will be reviewed, incorporated into the ITIP where appropriate, and responses will be sent in September once the comment period has ended.

After approval by the Idaho Transportation Board in September, the ITIP will then be submitted to the Federal Highway Administration, the Federal Transit Administration, and the Environmental Protection Agency in October.

Public invited to give input Oct. 15 on plans to redesign the I-84/ID-50 Interchange (Exit 182) near Kimberly

Image of I-84/ID-50 Kimberly Interchange

The Idaho Transportation Department (ITD) is planning to rebuild the Interstate 84/Idaho Highway 50 interchange in 2024 and is seeking public input on several design options.

ITD will display five proposed designs, including the no-build option, at a public open house on October 15, 2019, at the Rock Creek Fire Department, 1159 Main St. N. in Kimberly. The meeting will be held in an open house format between 5 p.m. and 7 p.m., giving participants an opportunity to attend anytime within the two-hour time frame. Project team members will be available to discuss the project and answer questions about proposed designs.

The interchange is a key agricultural and industrial route for accessing the Magic Valley along ID-50. As the area grows and more commercial and residential development occurs, the interchange will become even more critical to the safe movement of people and goods.

Improvements are needed to maintain safety, improve mobility, and foster continued economic development in the area.

If you have questions or comments about the project but are unable to attend the public meeting please visit https://itdprojects.org/projects/i-84-kimberly-interchange or contact ITD Project Manager Andrew Young at 208-886-7854 or Andrew.Young@itd.idaho.gov.

 

Public invited to view final design for Declo Port of Entry project

Declo POE Close-up View

The Idaho Transportation Department invites the public to an open house event on Tuesday, June 11, 2019, to review and comment on the proposed final design for the new Declo Port of Entry project.

The open house will be held from 4 p.m. to 6 p.m. in the city council chambers at Burley City Hall, 1401 Overland Ave. in Burley. Those interested in the project may drop in anytime during the meeting to view the proposed final design, project illustrations and related information. Preliminary information on the construction traffic control plan will also be available for review. Representatives from ITD and the Stanley Consultants design team will be on hand to answer questions and gather input.

The purpose of the project is to relocate the Cotterel Port of Entry (POE) to a site that provides a safer traveling experience for all vehicles on the interstate system.  The new location on Interstate 84 (near MP 219, east of Exit 216) will facilitate more efficient trucking operations through advanced technology and will meet current federal compliance standards.

Elements of the new facility will include: new eastbound and westbound on and off ramps, support of utility infrastructure, scales with weigh-in-motion and automated vehicle identification technologies, video equipment, luminaries, signage and operations office buildings.  Construction is scheduled to start in FY 2020.

For more information on the open house and the project, please contact Nathan Jerke, ITD Project Manager at 208-886-7809 or Nathan.jerke@itd.idaho.gov.

Public meeting planned June 6 for US-93, 300 South Rd. project in Jerome

The Idaho Transportation Department (ITD) will host a public open house for the US-93, 300 South Rd. project Thursday, June 6 at the Idaho Fish and Game, Magic Valley Regional Office, at 324 South 417 East in Jerome.

ITD plans to expand the existing two-lane highway to four lanes with a center median and turn bays. The public is invited to review the proposed improvements and discuss details with the project team. The meeting will be held in an open house format; meaning the public can drop by anytime between 5 p.m. and 7 p.m.

The US-93, 300 South Rd. is the fourth and final segment of overall corridor improvements developed as part of the US-93, I-84 to SH-25 Jerome County Environmental Assessment (EA). The Federal Highway Administration issued a Finding of No Significant Impact (FONSI), approving the EA in 2007.

If you cannot attend the public meeting on June 6, but would like more information or to comment on the project, please send an email to the ITD Project Manager, Nathan Jerke, at nathan.jerke@itd.idaho.gov by June 20, 2019.

Innovative virtual public meeting allows Idahoans to comment on upcoming ID-55 project online

Smiths Ferry Featured

To maximize the public’s ability to provide input on upcoming construction, the Idaho Transportation Department is launching a virtual public meeting on proposed improvements for Idaho Highway 55 from Smiths Ferry to Round Valley.

You can view the project information and participate in the virtual public meeting by clicking here or visiting https://bit.ly/2BCNCzx.The Department will receive public comments until March 3. The online meeting tool allows visitors to interactively learn about the project and provide direct feedback to ITD.

The improvements will address existing safety concerns on the corridor by widening the road, adding ditches to catch rockfall and constructing shoulders and guardrail where appropriate. Additional work will improve wildlife habitat and passage under the roadway. The result will be a safer corridor with higher speed limits to improve mobility.

“This project will affect a diverse group of people from far and wide, including nearby residents and recreationists from around the region,” said ITD engineering manager Jason Brinkman. “This virtual public meeting allows us to effectively reach those groups and get their input to help us make well-informed decisions.”

Construction could begin as soon as the Fall of 2019. The work will require significant blasting and excavating of the hillsides adjacent to ID-55. To complete this work, regular closures of several hours will be enforced. ITD will conduct extensive public outreach to inform users of the highway about these impacts and work with them to mitigate the impacts of construction.