Construction near New Plymouth will provide safety improvements at ID-72/US-30 intersection

The Idaho Transportation Department will enhance safety at the intersection of Idaho Highway 72 and US-30 during late September and October.

Crews will reconfigure the intersection to a more common, “t-type” intersection. This will eliminate the free-running movement on ID-72.

During construction, US-30 will be reduced to one lane with temporary traffic signals in place to control traffic.  Delays of up to 15 minutes are possible.  During the same timeframe, ID-72 will be closed to thru traffic.

ID-72 traffic will be detoured one mile south to SE 2nd Avenue. Truck traffic will be detoured to US-30, Interstate 84, and Sand Hollow Road. Detours will be clearly posted and also available at 511.idaho.gov.

Crews will work daytime hours Monday through Saturday. The project will be complete in late October.

Langley Gulch Culvert Replacement

During the same timeframe, ITD will replace an aging culvert near Langley Gulch on ID-72 near the intersection work and within the existing work zone.

For more information on this project, as well as a full construction list for southwest Idaho, please visit itd.Idaho.gov/D3.

Traveling for the Eclipse? Don’t start a wildfire

Wildfire Generic

Hundreds of thousands of people are expected to travel to Idaho to view the August 21 solar eclipse – right in the middle of fire season. The Idaho Transportation Department (ITD) has some simple tips to avoid accidentally starting a wildfire during your road trip.

The majority of wildfires in Idaho are started by us humans. Driving in your car can be the source of several ways those fires start, whether it’s hanging metal hitting the road or throwing out lit cigarettes.

Here are four things to do while you’re on the road to see the solar eclipse:

  1. Before leaving, look under your car and check for hanging parts. Mufflers often get knocked loose and can hang low to the ground. If you see something hanging down, tie it up. These parts can skip on pavement and shower sparks on grasses alongside the roadway.
  2. If you are towing a trailer or camper, ensure safety chains are fastened and not dragging. Bumps in the road can cause hanging chains to hit the ground and spark.
  3. Don’t drive or park on tall grass. The exterior of your engine or exhaust can get up to 2,800°F. Contact with dry grass can easily start a fire. See this video PSA from U.S. Forest Service.
  4. Don’t throw out lit cigarettes. When you’re done with a cigarette, make sure the end is completely put out and cool to the touch. Otherwise, you’re throwing a small fire onto a big pile of tinder.

ITD hopes everyone traveling to see the eclipse has a fun and safe time. By checking your car before you leave and making smart choices on the road, you can help ensure this experience stays wildfire free.

4 myths about road tripping for the solar eclipse in Idaho

4 Eclipse Trip Myths

The August 21 solar eclipse has everyone talking. Unfortunately, some of those conversations are filled with made up assumptions, inaccuracies, or straight-up lies. So, in this age of alternative facts, here are four road myths surrounding the eclipse we want to clear up.

#1. The interstate will be turned into a one-way – FALSE

We’ve heard it from all over the state of Idaho: “The route in my backyard will be changed to go just one direction.” This is absolutely false. This rumor is so untrue, the pants set on fire by those telling it runs the risk of burning down the entire state.

So, let’s be very clear. Whatever the configuration of the road is today will be the configuration before, during, and after the eclipse. I-15 will remain a north- and southbound road; same for U.S. 95 –  and so on and so forth.

#2. Semi-trucks will not be allowed on the road – MOSTLY FALSE

Most commercial traffic will be allowed to travel during the eclipse – though we want to throw out there that traffic will likely be congested. There will be a restriction on very large loads.

The Division of Motor Vehicles is implementing a “holiday protocol” for those big rigs. Starting Sunday, Aug. 20th at 4 p.m. and ending at dawn Aug. 22 loads exceeding 10’ wide, 100’ long or 14’6” may not travel on Interstate or State highways south of Lewiston.

For questions, call the overlegal permits department at 208.334.8420 or email at permits@itd.idaho.gov

#3. All construction will be suspended during the eclipse – SOMEWHAT TRUE

Okay, construction is complicated. The window for crews to get into a place and do work that may take months to complete can be narrow. Where projects can be suspended to improve traffic flow and safety, we are doing that. For some projects, we can’t – if we’ve only got one lane done on a bridge, we can’t pull up and make a difference.

If it helps, we’ll have flaggers out to help move people along. Please use extra caution and patience in active work zones.

#4. Traveling for the eclipse is like driving to work. I don’t need to take extra steps – FALSE

Areas where the moon will completely block the sun – the “Path of Totality” – generally fall on pretty remote parts of Idaho. We’re talking bad or no cell signal, sparse services like gas stations, and lots of big critters that can cross the road. Also, much of southern Idaho is a desert, full of dry grass just waiting to catch fire.

Plan ahead and make smart choices during your trip. Your GPS may not work in the mountains so bring a physical map (they still make those), extra food and water, and fill your tank full before you cross into the hinterlands. Also, make sure nothing is hanging low from your car or trailer. A dropped muffler can hit the road and spark, which is a great way to start a wildfire.

This total solar eclipse is a rare opportunity to see something amazing and we are excited so many people want to come to beautiful Idaho to see it. Help share these truths and bust those myths out there!

Things to check before your eclipse road trip

Road Trip Generic

The Idaho Transportation Department is advising drivers who are planning to travel to view the eclipse to be prepared in the event of delays or an emergency.

The eclipse takes place on Monday, Aug. 21. It is anticipated there will be numerous travelers on highways and local routes.

Drivers should ensure their vehicles are in good working order. This includes getting the tire pressure checked, and making sure a vehicle’s battery, tires, headlights and brakes are in good working order.

In addition, drivers should carry emergency flares or portable signs to alert other drivers of an emergency, extra food and water, extra clothing or blankets for cooler weather, a flashlight with fully charged batteries, a fully charged cell phone and a map of Idaho highways.

The transportation department’s 511 web page and mobile app for Apple or Android will alert drivers to delays on the state’s highways. However, those planning to use the app on their smart phones or check web pages likely will not have cell service in remote or mountainous areas in Idaho.

When possible, travelers are encouraged to return home on Tuesday, Aug. 22, or later in the week. This will reduce the number of vehicles on highways that are returning home Monday afternoon.

The transportation department is working to develop a statewide plan to ensure motorists have the information they need ahead of the Aug. 21 event. ITD’s Jennifer Gonzalez shares some information about the agency’s preparation efforts, including how drivers can prepare, in the latest edition of the department’s In Motion video series below.

Look up: ITD finds $320k in annual savings in overhead sign inspections

Overhead Sign Inspection

BOISE – The Idaho Transportation Department (ITD) recently found significant savings, and it was just overhead.

There are nearly 2,000 overhead sign structures on the state highway system, and more than a quarter of them are inspected each year. Finding even a slight savings in the per-unit cost can result in a significant overall savings, and that’s just what the ITD Bridge Asset Management team has done.

“In the 2005 contract, we paid an average of around $1,200 per structure,” said Bridge Asset Engineer Jake Legler. “In our most recent contract (April 2017), we are paying an average of $400 per structure. We are inspecting an average of 500 structures per year. This equates to a savings of nearly $320,000 per year.”Innovate ITD Logo

An overhead structures inspection program resumed in 2016 after an initial round of safety inspections were conducted from 2005-2007. The new inspection program called on sign-structure inspection experts Collins Engineers. National bridge inspection software also had to be modified to accommodate the nation’s only element-level inspections of overhead structures.

“Our bridge inspection is done at the element level, which means each structural element is assigned a condition rating. We set up the overhead structures inspection program to be at the element level so that it was consistent with our bridge inspection program. We used nationally defined element numbers for overhead structures in order to be consistent with other states if they ever adopt an element-level sign inspection program.”

The result goes beyond monetary savings and efficiency, to enhancing safety for travelers on Idaho’s 12,000-mile state highway system. The idea came through ITD’s innovation program earlier this year.

“In addition to the safety improvements on the structures themselves, we were able to employ some innovative inspection and traffic-control techniques, like using high-powered binoculars and climbing structures rather than closing lanes,” Legler explained.

“That not only made it safer for our workers and required no lane closures, but it also brought the inspection costs down significantly,” he added.

Interagency effort underway to prep for Idaho Solar Eclipse

Solar Eclipse Corona

As the countdown to the August 21 solar eclipse approaches, the state of Idaho is gearing up for a potentially large influx of visitors that will be descending into southern Idaho to view this natural phenomenon.

In preparation for the event, the Idaho Transportation Department is working with other state and local agencies actively preparing and organizing a statewide plan, which includes being responsive, ready to assist law enforcement and most importantly, reducing impacts to travelers before, during and after the eclipse

“We know this will be a big draw for tourism in Idaho and most of the people are going to use our roads to get there and see it,” said ITD Chief Engineer Kimbol Allen. “We want visitors to have an enjoyable time in Idaho. We want to make sure that we do everything we can do have the roads open and ready to allow traffic to get in and back out after the eclipse.”

ITD is sharing tips with travelers on our website-as well as on overhead message boards and through the media that focus on safety, preparedness and travel plans. Most importantly, ITD encourages everyone to be patient, be responsible and give yourself enough time for travel prior to and after the eclipse.

We want our resources out informing people about what’s happening and what they can expect and what they can do about it and where the can be be, safely, to enjoy the eclipse.

The Idaho Department of Commerce has also devoted a statewide website with links to local planning resources, preparedness information and eclipse materials.

Flooding sends debris crashing into bridges

Bridge Snag Removal

ITD crews in the Treasure Valley are on high alert around the clock as prolonged flooding sends debris down river, creating blockages on bridges.

Entire trees have been uprooted by Boise River flows that well exceed the average. Currently, the river is at 8800 cfs at the Glenwood St. measuring station. This brings the water level close to the bottom of the bridge. You can watch a video of crews clearing debris from the ID-52 bridge in Emmett below.

Increased debris and higher water levels create more hazards to bridges. Branches can catch on the supports or bridge girders, which can lead to a domino affect of accumulating debris. This debris can raise the river levels more and adds pressure to the bridge supports. Left unchecked, this could lead to catastrophic failure.

To combat this threat, ITD has crews monitoring the bridges. They routinely check for debris build up and signs of stress on the bridge. Several excavators are also parked by bridges, which can be used quickly to break up any build up.

By patrolling regularly and stationing equipment nearby for ready use, ITD is positioned to keep this year’s record flooding from causing disaster to our road system.

Train derailment closes lanes on U.S. 95

Train Derailed near U.S. 95

Coeur d’Alene – Multiple train cars derailed ten miles north of Athol, ID near the roadway Monday, spilling corn and posing a danger to drivers on U.S. 95. ITD immediately closed southbound lanes to travel, placing flaggers on the road to direct two-way traffic on the northbound lanes. Watch aerial video of the derailment below.

Motorists can expect both southbound lanes will be closed for the next two weeks while crews remove 25 derailed cars. Crews on scene have observed an increase in animals approaching the wreck to eat the spilled corn, so drivers should use caution in the area.

ITD engineers have been unable to determine the extent of the damage the derailment caused. Primary concern focuses on an approach to U.S. 95 where the cars derailed.

ITD will continue to work with BNSF to ensure safe travel near the derailment.

Mudslide caught on camera totally covers road

U.S. 95 Slide

ITD crews were on scene with cameras rolling as a hillside broke free and covered a section of U.S. 95 south of Bonners Ferry on Friday, April 7.

In the video, you can see tons of mud, rocks, and trees slide down, pushing two layers of concrete barriers off the road. Overall, 800 cubic yards of debris slid onto the road.

Thanks to quick action of ITD crews on scene, no one was injured by the slide. ITD Land Surveyor Mathew Wilson, who took the video, was assessing the hillside stability. He heard popping and cracking and knew another slide was imminent. Thinking quickly, the flaggers on scene stopped traffic and just three minutes later the hillside gave way.

ITD crews cleared the debris from the road Friday evening. Additionally, crews dug out an extra 600 cubic yards of dirt beside the road to create a channel for water to run.

Currently, ITD is keeping one lane open on this section for the safety of the traveling public. Cars will travel on the southbound lane, away from the hillside. Flaggers will direct traffic and actively monitor the area.

This section of hillside continues to be unstable. Crews have noted progressive shifting near U.S. 95. Rain is in the forecast and there remains 18 inches of snow above the slide area. ITD is working with geology specialists to assess the situation. With public safety as a priority, additional traffic control measures may be taken.

Several areas of North Idaho are impacted by this year’s historic winter precipitation. Slides have occurred on Idaho State Highways 3, 5, 57, and 97.

Bridge replacements and pavement rehabilitation to begin on U.S. 95 near Parma in mid-April

Parma Bridge U.S. 95

Reconstruction of two bridges on U.S. 95 in Parma will begin in mid-April.

Work will occur at the junction of U.S. 95 and U.S. 20/26 and include the reconstruction of the Union Pacific Railroad overpass, Sand Hollow Creek Bridge and nearby pavement rehabilitation.

*The project is scheduled to be complete this winter.

*A posted detour will be in place during the project. A separate truck detour will also be posted. The speed limited will be reduced to 45 mph in the work zone. The speed limit will be reduced to 45 mph on U.S. 20/26 when shoulder or median work is occurring. Flaggers will assist motorists through the work zone during different phases of the project.

*Most work will occur Monday through Friday, and some Saturdays.

Motorists are encouraged to check 511.idaho.gov for construction updates and detour information. For a full list of construction projects scheduled to begin across southwest Idaho, please visit our website at itd.idaho.gov/d3 and click on the construction tab. Some updates will also appear on Twitter and Facebook.